Whilst every care has been taken in formulating these instructions no responsibility whatsoever will attach to and or claim lie against the manufacturer and or the distributor of the heater as a result of any failure to follow the whole or any part of the instructions and or as a result of incorrect information herein and or any omission.
Clean air wood heaters instructions.
Coonara woodheaters should not be modified in any way.
This appliance should be maintained and operated at all times.
The heater can get very hot so watch obviousfirehazards.
Ensure the side of the column with a 45 mm gap on the bottomedgegoesattherearoftheheater.
Cleanair woodheating is totally committed to excellence and innovation in wood heaterdesign.
Undo these 2 screws and set aside.
Slide the heater body forward to allow for the cladding to fit in between the zero clearance casingandtheheaterbody.
Clean air woodheating page 2 z system installation instructions step1 refer to clearances as specified throughout these instructions and select position for your heater.
Clean air s innovative use of the latest technology has created a wood heater.
Every clean air wood heater comes with a 15 year firebox structural warranty.
Instructions freestanding consoles inserts standard edwardian victorian models.
2019 clean air.
Do not operate the heater with the door open for extended periods.
These are located at the bottom in front of the fans.
Clean air wood heaters are designed in australia especially for.
Make sure your wood is dry wet or green wood is hard to light burns poorly and the evaporating water cools the fire which creates smoke.
Use small split wood to get the fire well established.
Use your heater according to these instructions.
Shamic shamic shamic shamic flue installation instructions are included with all flue kits.
Lay the firebox on its back.
Open air control beforeopeningfiringdoor.
Clean air manufacture slow combustion wood heaters using low emission technology to gain maximum heat output with minimum emission into the atmosphere.
Caution.
Page 3 this heater has been tested and approved to as 2918 1990 using a flue kit.
There are 2 screws holding the heater body to the zero clearance casing.
Run combustion heaters on high burn air vent fully open for the first 20 minutes of operation.
Locate the column onto the four locating points on the base of the heater.
Secure the column to the base of the heater with thefourselftappingscrewsprovided.
Light the fire using sufficient kindling to establish a hot fire quickly.